How your projects are ordered

This feature is available to all users


Your projects are listed on the Projects page. The list can't be rearranged by dragging and dropping, but you can switch between tabs, search, and change how the list is displayed to find what you need.


Switch between the tabs of your project list

  • Recent: your projects in the order you last opened them
  • All: every project you have access to
  • Team: team projects you haven't joined yet. Select Join on a project to join it. The tab only appears when there are team projects you can join.
  • Your project groups: each group appears as its own tab, listed alphabetically. A group tab shows its projects in your own sidebar order.

The Projects page with the Recent and All tabs and the project group tabs above the project list in grid view.


Open the project list in the sidebar

You can open the sidebar with your project list on the Projects and Reports pages, in portfolios and in projects: select the sidebar icon at the start of the page header (keyboard shortcut: M). Learn more in Collapse or expand the list of projects in the left sidebar.

The Projects page with the project sidebar open on the left, filtered to two demo projects.


Find a specific project

Select the search icon at the top of the Projects page and start typing a project name to filter the list.

The Projects page, where a project name is typed into the search field opened from the search icon to filter the list.

Change how your projects are displayed

Use the view options next to the search icon to switch between the available views for your project list.

The Projects page with the view options open next to the search icon, offering Grid or List.

Please Note:
  • On the Projects page, projects and project group tabs can't be reordered by drag and drop. To change the order of your projects, drag them in the left sidebar.
  • Project groups are always listed alphabetically.

Sort your projects

In list view, select a column header to sort the list:

  • Project name: A to Z on the first click, Z to A on the second.
  • Modified: newest first on the first click, oldest first on the second.

A third click returns the list to its default order. The Recent tab always shows the order in which you last opened your projects, so it can't be sorted.

On a project group tab, the projects appear in your own sidebar order, labeled Manual order next to the Project name header, until you sort by a column.

A project group tab in list view with Manual order next to the Project name header, and the Modified and Owner columns.


Business and Pro users can organize projects into groups. See create a folder structure for your projects.

Was this article helpful?