Board View and List View in Projects

This feature is available to all users.


MeisterTask offers three views for the tasks in a project: Board, List and Timeline. You'll find them in the Tasks tab at the top of your project. Switch between them at any time to fit the way you work. This article covers Board and List; the timeline has its own article, Timeline.

Tasks, Documents and Chat tabs

Projects have three tabs at the top: Tasks, where you work with your tasks in Board, List or Timeline, Documents, where you collect the project's key documents, and Chat, where you talk with the project's members. Learn more about documents in Project Management Basics.


What is Board View?

Board view displays all tasks in a Kanban-style layout, with each task shown as a card. The board is organized into sections, each representing a stage in your workflow (for example To Do, In Progress, Done).

Board view is ideal for teams that prefer a high-level, visual overview of tasks moving through stages.

This is what a board looks like:

Board view of a project in the Tasks tab, with sections and task cards


What is List View?

List view shows all tasks in a project as a clear, easy-to-read list, similar to a spreadsheet, so you can quickly see details like tags, due dates and assignees.

In List view you can:

  • Group tasks by section, assignee, due date or status.
  • Sort by any column.
  • Choose which columns are shown.
  • Use the section menu (...) to reorder tasks, set a task limit, manage automations, change the section's icon and color, and insert or move sections. To rename a section, click its name.

List view of a project, grouped by section, with the Group by options open


Switching Between Board and List View

  1. Open your project and make sure the Tasks tab is selected.
  2. Click the view menu at the top right (it shows the current view, for example Board).
  3. Under the view names, choose Board, List or Timeline.

The same menu holds more options for the current view:

  • Sort: sort the tasks in every section, for example by due date. Learn more in Sort Tasks in a Project.
  • Show subtasks: show or hide subtasks in the view.
  • In List view: Group by and Columns.
  • In Board view: Compact board and Show on cards (see below).

Work Directly on Cards and Rows

In both views you can change a task without opening it:

  • Assignee: hover over a card and click the person icon, or click the assignee in a row, then pick a member.
  • Due date and tags: click the date or tag on a card or row to change it.

Both views also support the keyboard, for example to move tasks. To select several tasks at once, hold Ctrl (Windows) or Cmd (Mac) and click each task.

Blocked tasks. A badge on a board card or list row shows that the task is waiting on other tasks, and how many of them are still open. It disappears once the last blocker is completed. On the board, hover over the badge to see which task blocks it, or click it to highlight the blocking tasks. In List view, click the badge to see the task's relations: Blocked by, Blocking, Parent task and its subtasks. Click any task there to open it, even if it's in another project. The badge only shows when Subtasks and task relations is turned on in the project settings.

Blocked badge in a list row, clicked to show the task's blocker and subtasks

Group and Collapse Sections in List View

By default, List view groups your tasks by section. To group them differently:

  1. Click the view menu at the top right (List).
  2. Select Group by and choose No grouping, Section, Assignee, Due date or Status.

To expand or collapse a group, click the small arrow next to its name.


Searching and Filtering Tasks

Both views include search and filters that help you find tasks by criteria such as due dates, assignees or tags. Filters sit in a filter bar above your tasks; open it with the filter icon at the top right.

Learn more in Filter your project view.


Select Multiple Tasks and Perform a Bulk Action

Both views allow you to quickly perform bulk actions, such as assigning multiple tasks or setting a due date for multiple tasks at once.

Learn more in Select Multiple Tasks.


Customize Project Appearance Settings

You can choose how much each card on the board shows. These settings are saved per project.

  1. Click the view menu at the top right (Board).
  2. Turn on Compact board for smaller cards, or open Show on cards and turn Tags, Indicators, Thumbnails and Description on or off. For the description, choose First lines or Full description.

View menu of the board with Compact board and the Show on cards options

Projects where you haven't changed these options use your general appearance settings. Open them from the same menu with Defaults for all projects. Board sections always have the same medium width.


Insights

To see how a project is doing, click the Insights icon (bar chart) at the top right of the project, next to the filter icon. The panel shows:

  • Summarize recent activity (beta): an AI-written status update for the project (see below).
  • Project health: the number of open and overdue tasks, and the percentage done.
  • Distribution: how many tasks are in each section.
  • Progress: a burn-up chart of the project's scope and completed tasks over time, toward the project's target date.
  • Upcoming deadlines: tasks that are due soon.
Insights panel with Project health, Distribution and Progress

Summarize recent activity

Summarize recent activity creates a draft summary of your project's recent activity with AI. It's based on tasks completed during the last 7 days, overdue tasks, recent comments and the current state of the project, and covers this project only. Depending on the activity, the summary includes Progress, Blockers and Next Steps; sections with nothing to report are left out.

  1. Click the Insights icon at the top right of the project.
  2. Click Summarize recent activity.
  3. Review the draft. You can create a new version or copy it to share it with your team.
Not enough project activity

A summary can't be created when fewer than 3 tasks were completed and no comments were added during the last 7 days. The panel then asks you to check back once your team has been active in the project for a few days.


Was this article helpful?